Goshawk Court, CABOOLTURE

Goshawk Court, CABOOLTURE

1 into 12 RAL + 1 Balance Lot

Challenges

Solutions

  • New on-site detention was not permitted within National Electricity Grid easement.
  • Any proposed biobasin would have removed a developable residential lot.
  • Council required demonstration of non-worsening flood outcomes.
  • Any solution needed to avoid creating a new long-term Council asset.
  • Utilised widening of an existing Council-owned basin instead of constructing a new basin.
  • Achieved required detention volume above the existing still-water level.
  • Demonstrated non-worsening flood behaviour through targeted calculations and modelling.
  • Delivered an outcome acceptable to both Council and Energex without new assets.

Visual & Diagrams

Site Overview

Project Proposal

Basin Proposal

Project at a glance

~$50,000 saved

Avoided construction of a new detention basin

Maintained a fully developable residential lot.

Accepted with additional stormwater conditions that were appropriate

Process & Workflow

1

Concept Design and Modelling

2

Site investigation to provide Council a cost-benefit analysis

3

Developing final design for approval with 3 different authourites