Ernest Street, MARGATE

Ernest Street, MARGATE

MCU (Duplex) - Stormwater Technical Memorandum

Challenges

Solutions

  • Demonstrating suitability of retaining an existing gully-pit at the location of a new crossover
  • Provision for access to the development in a 1% AEP flood scenario where the gully pit is at capacity without the need for a localised overland flow study
  • Providing code compliance assessment due to the sloping nature of the existing site
  • Splaying of existing crossover to provide 1.0m clearance to an existing powerpole
  • Demonstrated that the existing gully pit maintains full hydraulic performance and can remain in place without reconstruction.
  • Confirmed safe driveway access during the 1% AEP event using pit sag-depth and road-level checks, avoiding the need for an overland flow study.
  • Verified compliance with relevant slope and earthworks codes based on the existing site grade and proposed building levels.
  • Adjusted crossover geometry and splays to achieve the required 1.0 m clearance to the existing power pole while maintaining standard crossover design.

Visual & Diagrams

Ernest Street, Margate
Ernest Street, Margate
Civil Drawing - Ernest Street Margate

Project at a glance

$5,000

Avoided need for localised flood study

Approval without a single RFI

Approval did not result in further conditions on the matter

Process & Workflow

1

Initial Consultation and site review

2

Concept Design and Modelling

3

Report/letter providing an assessment of compliance