Demonstrating suitability of retaining an existing gully-pit at the location of a new crossover
Provision for access to the development in a 1% AEP flood scenario where the gully pit is at capacity without the need for a localised overland flow study
Providing code compliance assessment due to the sloping nature of the existing site
Splaying of existing crossover to provide 1.0m clearance to an existing powerpole
Demonstrated that the existing gully pit maintains full hydraulic performance and can remain in place without reconstruction.
Confirmed safe driveway access during the 1% AEP event using pit sag-depth and road-level checks, avoiding the need for an overland flow study.
Verified compliance with relevant slope and earthworks codes based on the existing site grade and proposed building levels.
Adjusted crossover geometry and splays to achieve the required 1.0 m clearance to the existing power pole while maintaining standard crossover design.
Visual & Diagrams
Project at a glance
$5,000
Avoided need for localised flood study
Approval without a single RFI
Approval did not result in further conditions on the matter
Process & Workflow
1
Initial Consultation and site review
2
Concept Design and Modelling
3
Report/letter providing an assessment of compliance